The newest Howard Hughes tower in Kaka'ako. About 450 homes, a Level 8 wellness deck, and views across the new Victoria Ward Park to the harbor and ocean.
Get Mahana pricing All Oahu new constructionMahana is a 39-story tower with 420 tower homes and 30 podium homes, per the developer's site (Howard Hughes' August 2026 release counts 451). It overlooks Victoria Ward Park, with the lobby on Level 1 and the club-style amenity deck on Level 8. The public sales gallery opened August 8, 2026 at 1240 Ala Moana Boulevard. Howard Hughes has described early demand as strong but has not published a price list, so pricing comes from the gallery release by release.
The published floor plate runs from 456 sf studios to a 1,523 sf three-bedroom corner. Here is the spread from the developer's residences page:
| Type | Size range | Notes |
|---|---|---|
| Studio | 456 to 499 sf | Residences 08 to 11 |
| 1 bedroom | 652 to 702 sf | 1BA |
| 1 bedroom + den | 749 to 792 sf | Good work-from-home option |
| 2 bedroom | 894 to 1,047 sf | 1 or 2 baths depending on plan |
| 3 bedroom | 1,441 to 1,523 sf | 3BA, the 00 and 01 stacks |
Interiors are by Tihany Design: high ceilings, Juliet balconies, floor-to-ceiling glass, oak floors in the main living areas and Vista Walls in select homes. Kitchens get Wolf cooktop, oven and microwave, Sub-Zero refrigeration, Studio Becker cabinetry and a quartzite island. The 00 and 01 plans include a kitchen desk cabinet.
Ask me for the current availability sheet and I'll mark the stacks I think are the best value.
Ask about Mahana availabilityArchitecture is by Solomon Cordwell Buenz (Francesco Mozzati), the same firm behind The Park Ward Village. Tihany Design did interiors and VITA Planning & Landscape Architecture did the grounds. The SCB team's point about Mahana is the view corridor: the Vista Walls are sized to take in the park, the harbor and the ocean.
Early in a tower's sales cycle is where you have the most choice of stack and floor. Park-facing homes on the makai side will command the premium; mauka and sunrise-facing homes are where value buyers should look. I'd pull the public report before committing to check the HOA budget and the parking allocation for your plan type.
Howard Hughes hasn't published a completion date I can point you to yet. Some third-party sites say 2031; I'd treat that as a guess until the public report says otherwise.
They aren't posted publicly. The gallery releases pricing in phases, so the quickest way to get real numbers is to have me request the current sheet for you.
The studios and one-bedrooms can be, especially if you want Ward Village amenities without paying for a view tower. I'd compare it against The Launiu's smaller plans before deciding.
We'll book the gallery, register you as our client, and compare Mahana side by side with the other Ward Village towers.
Schedule a Mahana visitTony Kawaguchi (R), Broker RB-21841, The Kawaguchi Group at eXp Realty. 20+ years selling Oahu real estate, $1B+ in career sales, 20+ agents.
The Kawaguchi Group at eXp Realty is not the developer or the developer's sales agent for any project on this page, and represents buyers. Renderings and screenshots are taken from each developer's public marketing website and are the property of the developer; they are artist's conceptions and may not reflect the finished product. Prices, availability, floor plans, completion dates and features were compiled from developer websites and published reports as of September 19, 2026 and change often. Nothing here is an offer to sell or a solicitation where prohibited; always read the developer's public report and sales documents before you commit. Equal Housing Opportunity.